L-536 Levee Outlet Structures

Corning, Missouri

OWNER

USACE

CLIENT

Rust Constructors

ENGINEER

USACE

PROJECT REVENUE

$675,000

TIME

2021

D.CaseStudies L536 Ditch 7 MO Web 2048x1153 1
Griffin Difference

Once Griffin was subcontracted, Griffin quickly provided an extensive dewatering submittal. Once approved, Griffin was under a very short time frame to install and pull together manpower, equipment, and materials. Not only did Griffin accomplish this in a short time frame, but Griffin delivered a successful dewatering system that lowered groundwater at the site as designed, ON TIME.

THE CHALLENGE

This project included the construction of a new 4.5-mile Setback Levee (SBL), which crossed two (2) existing drainage ditches. Shallow groundwater was encountered during subgrade preparation for installation of the two (2) drainage pipelines with Gatewell structures. Since dewatering was not anticipated, this placed the project on hold and required the extensive turn-key dewatering system to be fast-tracked.

THE SOLUTION

The contractor had to competitively seek out qualified bidders to handle the dewatering efficiently and effectively. Several meetings with the USACE were required to gain approval for the system design, price, and approach. The Griffin plan was ultimately selected for being the most responsive, complete, and capable bid, even though it was not the lowest cost. Griffin’s design consisted of deep wells, a dual generator system with an auto switch gear, and telemetry to remotely determine flows and notify in case of generator failure or a decrease in groundwater flow.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Avenue O Building D
Avenue O Building D
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >