GRIFFIN DIFFERENCE

Griffin’s design to depressurize the underlying alluvium formation performed very well and helped the contractor maintain an aggressive project schedule. Griffin provided a turn-key solution and completed all dewatering permitting, design, submittal, and installation. Griffin’s deep well system design was optimized for the difficult dewatering conditions at the site. Large diameter wells were drilled up to 50 ft. below the excavation depth to depressurize the underlying soils and pump high volumes of water.

THE CHALLENGE

A deep 35 ft. excavation with sheet pile shoring was required for this project. Highly stratified soils and underlying alluvium caused difficult dewatering conditions. Unstable soils near the planned excavation depth further complicated the tunnel construction. Water treatment for hydrocarbon contamination was also required for several wells.

THE SOLUTION

Griffin designed and installed a deep well dewatering system to target the coarse alluvium from 45 ft. to 85 ft. below grade. Large diameter wells were drilled and completed to 85 ft. below grade to depressurize the formation below the tunnel excavation. The dewatering system produced approximately 550 GPM and the depressurization of the formation provided a successful project with limited sumping. Temporary water treatment was required to remove hydrocarbon contaminants from the effluent of several wells. Griffin also designed and installed the temporary treatment system for this project.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Mill Creek Diversion Chamber Project
Mill Creek Diversion Chamber Project
Learn How >
Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
Airport Expansion PFAS Treatment Project
Airport Expansion PFAS Treatment Project
Learn How >
Antero Dam and Reservoir Project
Antero Dam and Reservoir Project
Learn How >
Petmin Pig Iron Plant Project
Petmin Pig Iron Plant Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
FedEx-Dane County Regional Airport Project
FedEx-Dane County Regional Airport Project
Learn How >
IQHQ-Research and Development District Project
IQHQ-Research and Development District Project
Learn How >
Greenwood Wastewater Main Repair Project
Greenwood Wastewater Main Repair Project
Learn How >
Brazoswood Athletic-High School Project
Brazoswood Athletic-High School Project
Learn How >