Avenue O Building D

Chicago, Illinois

OWNER

Northpoint Development

CLIENT

Northpoint Development

REVENUE

$292,000

TIME

2020

D.CaseStudies IMG 0246 WEB2
GRIFFIN DIFFERENCE

Griffin has worked at the site before and had the experience to properly design the system and bring the right equipment for installation, the first time. Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the Client.

THE CHALLENGE

Difficult soil conditions consisting of urban fill terminating at a clay layer 19 ft. below ground surface and a 25 ft. setback from the Critical Zone as determined by the railroad.

THE SOLUTION

Griffin installed the system using our Track Punch Jetting Tool for wellpoints. This allowed us to install through the variable soils by allowing additional downward pressure during jetting, and providing a cased hole for well construction. Based on our experience in the area we installed extra wellpoints to dewater the mid-point of the bore under the railroad.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >