College Park-Gateway

College Park, Maryland

OWNER

Buzzuto Development

CLIENT

Buzzuto Construction

CLIENT

Bohler Engineering

TIME

2020-2021

REVENUE

$157,500

D.CaseStudies Buzzard Point 20200925 104827 Web 2048x1151 1
GRIFFIN DIFFERENCE

Griffin’s relationship with client and vast experience in the area was invaluable in assisting the client in their decision.

We emphasized Griffin’s long history of successful projects. Griffin’s accumulated knowledge of soil and groundwater conditions in the metro Washington area is exceptional and assisted Griffin with designing and implementing a system that allowed the project to proceed on-time and on-budget.

THE CHALLENGE

Aster College Park is a new mixed-use community in Prince George’s County, MD. Difficult fine grained soils and potential refusal indicated gravel packed wells and sumping as the best methodology.

THE SOLUTION

After an onsite meeting with the client, it was determined the conditions warranted the installation of deep wells.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >