Chesapeake City WWTP

Chesapeake City, Maryland

OWNER

Chesapeake City, MD

CLIENT

Wickersham Construction

TIME

2021

D.CaseStudies Chesapeake
GRIFFIN DIFFERENCE

The Griffin team designed and installed the system to provide the required 8 ft. of drawdown allowing the excavation to proceed in workable conditions. Griffin worked closely with the client to expedite the installation as much as possible, while focusing on working safely in the difficult site conditions.

THE CHALLENGE

This treatment plant is located on the banks of a canal connecting the Chesapeake Bay and the Delaware Bay. The soil was saturated and the water level was 5 ft. below ground. The excavation needed to extend more than 13 ft. below grade. The site was swampy and muddy, making access extremely difficult for the installation crew.

THE SOLUTION

Griffin’s operations team evaluated the site and determined the steps that were necessary to safely install the wellpoint system in the challenging environment. The contractor was on a tight schedule and leaned on the Griffin project management team for assistance in expediting the project schedule.

A 700 LF wellpoint system was installed to facilitate construction of the Process Building, Denite Filters, Headworks, and Influent Pump Station.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >