Fort Eustis Sump Pit Structure

Newport News, Virginia

OWNER

US Army Corps of Engineers

CLIENT

Rockford Corp.

TIME

2020

module background 2
GRIFFIN DIFFERENCE

Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the client.

THE CHALLENGE

The typical scenario of layed river and or marine deposits creating interfacial conditions and SP soils capable of higher flows.

THE SOLUTION

Griffin employed wellpoints on proper centers to accommodate the flow and the required drawdown. Griffins experience to properly install the wellpoint equipment to achieve maximum performance.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >