Antero Dam and Reservoir

Park County, Colorado

CLIENT

Tezak Heavy Construction

OWNER

Denver Water

ENGINEER

RJH Consultants

TIME

2014

REVENUE

$205,000

module background 2
GRIFFIN DIFFERENCE

Griffin worked with all necessary parties to complete a stamped and approved engineering plan prior to starting the dewatering process. Even when the installation method had to be adjusted mid-way through the project, Griffin modified the plan without delay to complete the installation on schedule. Griffin’s engineered dewatering plan allowed for the toe drain to be installed successfully with no delays despite difficult soil conditions.

THE CHALLENGE

The Antero Dam is located on the South Platte River in Park County, Colorado. Over the decade before our work there, the dam was closed due to fluctuating surface water levels. Denver Water needed to install a toe drain at the bottom of the dam, which was not included in the original design. Dewatering of the toe drain excavation was needed to reduce seepage that would cause instability of the dam. The remote project location and complex geology consisting of layers of clays, silts and sands made the dewatering a challenge. Griffin employed a combination of installation methods to most efficiently install the dewatering system.

THE SOLUTION

Griffin installed 930 vacuum wellpoints along both sides of toe drain excavation. During installation of the wellpoints, increased soil instability required that we seamlessly switch from the jetting method to a drilling method to complete the installation. Griffin installed four (4) 500 ft. wellpoint systems. Each system produced 200-300 gallons per minute (GPM) for a total of 1200 GPM.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >