Antero Dam and Reservoir Project

Park County, Colorado

OWNER

Denver Water

TIME

2014

 

module background 2
GRIFFIN DIFFERENCE

Griffin worked with all necessary parties to complete a stamped and approved engineering plan prior to starting the dewatering process. Even when the installation method had to be adjusted mid-way through the project, Griffin modified the plan without delay to complete the installation on schedule. Griffin’s engineered dewatering plan allowed for the toe drain to be installed successfully with no delays despite difficult soil conditions.

THE CHALLENGE

The Antero Dam is located on the South Platte River in Park County, Colorado. Over the decade before our work there, the dam was closed due to fluctuating surface water levels. Denver Water needed to install a toe drain at the bottom of the dam, which was not included in the original design. Dewatering of the toe drain excavation was needed to reduce seepage that would cause instability of the dam. The remote project location and complex geology consisting of layers of clays, silts and sands made the dewatering a challenge. Griffin employed a combination of installation methods to most efficiently install the dewatering system.

THE SOLUTION

Griffin installed 930 vacuum wellpoints along both sides of toe drain excavation. During installation of the wellpoints, increased soil instability required that we seamlessly switch from the jetting method to a drilling method to complete the installation. Griffin installed four (4) 500 ft. wellpoint systems. Each system produced 200-300 gallons per minute (GPM) for a total of 1200 GPM.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >