Brazoswood Athletic-High School Project

Clute, Texas

CLIENT

Stewart Builders

ENGINEER

Matrix Structural Engineers

REVENUE

$75,000

TIME

2020

D.CaseStudies Brazoswood final

Griffin installed the dewatering system in a timely manner and the contractor was able to maintain their schedule because the dewatering system kept groundwater under control. Griffin provided weekly monitoring of the dewatering system and fuel service throughout the project to ensure that the system was operating properly.

THE CHALLENGE

Lowering groundwater 17ft. below ground surface for an excavation of approximately 550 ft. x 100 ft. The new building foundation was connected to an existing building which limited room to install the dewatering system.

THE SOLUTION

A wellpoint dewatering system approximately 550 ft. long was installed parallel to the existing building.

Griffin installed 80 wellpoints at an approximate spacing of 7 ft. to a depth of 30 ft. We provided one operating and one standby wellpoint pumpto operate the system.

The pumps were plumbed to a 500-gallon fuel tank that provided almost one week of run time between fueling.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >