Castaic Creek Bridge Groundwater Treatment Project

Castaic Creek, California

OWNER

California DOT

TIME

Spring 2024 – Winter 2024

 

 

This project won the TDI Groundwater Treatment

Project of the Year 2025.

 

IMG 0225 scaled e1764017445931
GRIFFIN DIFFERENCE

Griffin excelled by bringing technical expertise, problem solving, and disciplined execution to every phase of the project. Our team optimized the treatment design before construction even began, then operated the system around the clock with the reliability and attention to detail the site demanded. By treating more than 165 million gallons without interruption and maintaining compliance in a sensitive waterway, Griffin proved our ability to deliver complex groundwater treatment at scale while supporting fast paced construction.

THE CHALLENGE

The project pushed the limits of groundwater management with high dewatering flows near 1,000 gallons per minute and strict NPDES discharge requirements. The team had to design oversized treatment equipment, manage complex chemical processes, and fit a large system into tight space within an active creek channel. Meeting extremely low discharge limits in a sensitive waterway required constant monitoring and precise operation. Together, these challenges called for both large scale engineering and meticulous control to keep the project compliant and on track.

THE SOLUTION

Griffin designed and deployed a high capacity treatment system built to handle nearly 1,000 gallons per minute while meeting strict NPDES discharge limits. The multi barrier train combined solids removal, chemical treatment, filtration, and specialized media to address site specific contaminants. The system was refined through pre construction sampling and operated continuously to keep water quality compliant and construction moving safely.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >