GRIFFIN DIFFERENCE

The Griffin team designed and installed the system to provide the required 8 ft. of drawdown allowing the excavation to proceed in workable conditions. Griffin worked closely with the client to expedite the installation as much as possible, while focusing on working safely in the difficult site conditions.

THE CHALLENGE

This treatment plant is located on the banks of a canal connecting the Chesapeake Bay and the Delaware Bay. The soil was saturated and the water level was 5 ft. below ground. The excavation needed to extend more than 13 ft. below grade. The site was swampy and muddy, making access extremely difficult for the installation crew.

THE SOLUTION

Griffin’s operations team evaluated the site and determined the steps that were necessary to safely install the wellpoint system in the challenging environment. The contractor was on a tight schedule and leaned on the Griffin project management team for assistance in expediting the project schedule.

A 700 LF wellpoint system was installed to facilitate construction of the Process Building, Denite Filters, Headworks, and Influent Pump Station.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >