Decatur School Annex Project

Chicago, Illinois

OWNER

Chicago Public Schools

TIME

2020

D.CaseStudy wellpoints
GRIFFIN DIFFERENCE

Track Punch allowed installation through the urban fill and eliminated the need for expensive pilot hole drilling with sonic drilling methods. We worked with the excavating contractor to move pumps, add/delete discharge piping, and assist with sumping as needed. Griffin provided drawings and calculations to assist with obtaining approval for the dewatering plan from the Chicago Board of Underground.

THE CHALLENGE

Dewatering required installation through upper urban fill terminating on top of clay soils in tight quarters.

THE SOLUTION

Griffin completed system installation with our Track Punch Jetting Tool. Due to the variable soil and the proximity of the clay to subgrade we were prepared to supplement the wellpoint systems with sump and pump systems as needed to allow work to continue.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >