Newport News, Virginia
US Army Corps of Engineers
Rockford Corp.
2020
Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the client.
The typical scenario of layed river and or marine deposits creating interfacial conditions and SP soils capable of higher flows.
Griffin employed wellpoints on proper centers to accommodate the flow and the required drawdown. Griffins experience to properly install the wellpoint equipment to achieve maximum performance.
Enter your excavation information to learn about options and considerations for selecting dewatering systems.