GRIFFIN DIFFERENCE

Griffin successfully installed the dewatering system and achieved the required drawdown while maintaining communication and excellent relations with the client.

THE CHALLENGE

The typical scenario of layed river and or marine deposits creating interfacial conditions and SP soils capable of higher flows.

THE SOLUTION

Griffin employed wellpoints on proper centers to accommodate the flow and the required drawdown. Griffins experience to properly install the wellpoint equipment to achieve maximum performance.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9 Project
Santa Ana Mainstream-Reach 9 Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >