Unusually heavy and persistent rains, unanticipated changes in soil conditions, design changes and previously unknown underground obstructions required the Griffin team to continuously monitor and make system adjustments to adapt to the changing conditions to keep the job moving forward.

THE CHALLENGE

The 400 ft. 48-inch storm drain system under the bridge needed to be modified for the new construction. The deepest section of the excavation went to an elevation of 20 ft below sea level. The challenge was to create sufficient drawdown without lowering the water table below the limits of nearby monitoring wells, while considering that the total discharge flow was limited by the client’s treatment facilities.

THE SOLUTION

Griffin designed and installed 25 deep dewatering wells to 35 ft. on 18-20 ft. centers. The close spacing of the wells concentrated the area of drawdown to a short excavation area. This design allowed excavation to proceed by operating only as many wells as needed to dewater small sections of the excavation. The wells averaged around 15 GPM however, individual well capacities varied considerably due to varying soils.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >