Integrity Dig Project

Griffith, Indiana

OWNER

Marathon Petroleum

TIME

2022

D.CaseStudies Integrity Dig Marathon Griffith Indiana
GRIFFIN DIFFERENCE

Our knowledge of the local geology allowed us to design the wellpoints with properly sized filter pack and reduced screen length.

Additionally, we provided the owner flexibility with our O&M proposal.

Finally, Griffin offered construction dewatering technical training to the Marathon integrity dig team.

THE CHALLENGE

The water table at the location was near the ground surface, requiring groundwater at site to be pre-drained prior to excavation. A “dry hole” would allow the welders to work safely to complete the pipeline repair.

Griffin has extensive knowledge of the area and knew proper well construction was required to prevent the pumping of fines from the wells.

THE SOLUTION

The Griffin team designed a wellpoint system configured in a horseshoe shape around the integrity dig location. The wellpoints were installed using hand-jetting techniques and filter pack material was emplaced the entire length of the borehole to prevent formation fines from entering the wells.

Griffin was also able to provide operations and maintenance of the system at a competitive rate. The above ground portion of the system consisted of 240 ft. of header pipe, 200 ft. of discharge hose and one diesel-powered wellpoint pump.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >