Linville Dam Essi Project

Morganton, North Carolina

OWNER

Duke Power Energy

TIME

2013-2014

D.CaseStudies Linvillle Dam Web e1680539259399
GRIFFIN DIFFERENCE

Our knowledge of the local geology allowed us to design the wellpoints with properly sized filter pack and reduced screen length. Additionally, we provided the owner flexibility with our O&M proposal. Finally, Griffin offered construction dewatering technical training to the Marathon integrity dig team.

THE CHALLENGE

The water table at the location was near the ground surface, requiring groundwater at site to be pre-drained prior to excavation. A “dry hole” would allow the welders to work safely to complete the pipeline repair. Griffin has extensive knowledge of the area and knew proper well construction was required to prevent the pumping of fines from the wells.

THE SOLUTION

Griffin provided expertise and oversight for the design and installation of an eductor system, wellpoint system, and sumping system for the deep excavation at the toe of dam. 58 eductor wells were installed to obtain the required drawdown and allow for construction of a safe and stable excavation.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >