GRIFFIN DIFFERENCE

Griffin worked closely with the owner’s geotechnical consultant to monitor water levels during the drawdown period. This information was used to update the groundwater and settlement models and provided the information needed to adjust the system throughout the project to mitigate the risk of excessive settlement. The system maintained drawdown for over one year to allow for the substantial amount of underground work that was necessary.

THE CHALLENGE

The project required a very deep excavation over 30 ft. below the groundwater table. The site was an entire city block and was bordered by a 100-year-old church and an underground Metropolitan Atlanta Rapid Transit Authority (MARTA) train station. A slow, controlled drawdown and limited movement of native material was necessary to minimize risk of settlement.

THE SOLUTION

Griffin designed and installed a 1,700 LF eductor system around the perimeter of the excavation. Groundwater modeling was used to project drawdown beneath adjacent structures and the model was updated with data from external groundwater monitoring points throughout the project. The eductor system was adjusted throughout the project to maintain water levels just below subgrade to minimize impact on the adjacent structures.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >