University of Nebraska-Kiewit Hall Project

Lincoln, Nebraska

OWNER

UNL

TIME

2021

module background 2
GRIFFIN DIFFERENCE

The contractor had limited on-site resources, so Griffin was able to provide a turn-key dewatering system to help mitigate the amount of groundwater needing to be sumped. Griffin achieved the required drawdown and met the client’s needs

THE CHALLENGE

The building’s basement had footings that extended through a sand layer into clay. The building was also being attached to an existing building on one side, and in close proximity to existing structures and streets. Two sides of the excavation were shored with sheet pile while the other sides were open cut.

THE SOLUTION

The contractor required the system be installed prior to the start of construction from the original ground surface, so a 700 ft. wellpoint system with 23 ft. deep wellpoints was installed. Griffin utilized vacuum wellpoints to remove as much groundwater as possible from the excavation to help limit the flows needing to be sumped. With such low flows being pumped from the excavation and the long duration the system was needed, the system was also winterized by Griffin using a glycol heating system and concrete blankets to keep the system from freezing.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Westminster Sewer Improvements Project
Westminster Sewer Improvements Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
The Yards Parcel I Project
The Yards Parcel I Project
Learn How >
The Driscoll at River Oaks High-Rise Project
The Driscoll at River Oaks High-Rise Project
Learn How >
Texas Medical Center Project
Texas Medical Center Project
Learn How >
St. Joseph Hospital Expansion Project
St. Joseph Hospital Expansion Project
Learn How >
SLC Airport Central Tunnel Project
SLC Airport Central Tunnel Project
Learn How >
Seabrook Gate Complex, CMAR Project
Seabrook Gate Complex, CMAR Project
Learn How >
Saylorville Lake/Big Creek Dam Project
Saylorville Lake/Big Creek Dam Project
Learn How >
Santa Ana Mainstream-Reach 9 Project
Santa Ana Mainstream-Reach 9 Project
Learn How >