Addicks and Barker Dams Rehabilitation Project

Houston, Texas

OWNER

United States Army Corps of Engineers

GC

Granite Construction

ENGINEER

United States Army Corps of Engineers

TIME

2017-2019

REVENUE

$500,000

D.CaseStudies addicks dam
GRIFFIN DIFFERENCE

Griffin’s significant experience in the Houston area, as well as our extensive experience in high-risk dam and levee excavations, was critical to determining the safest, most cost-effective project approach. Due to the highly variable geology at the sites, it was imperative to verify actual site conditions with the Granite team and the USACE so that the most appropriate dewatering method could be utilized. This approach led to dewatering by a combination of wellpoints and sumping and resulted in a truly collaborative effort between the USACE, Granite Construction, and Griffin to find the safest, most cost-effective method for completing the work.

THE CHALLENGE

The project required control of seepage through the soils below the dams for the construction of new outlet structures. This was required for stabilization of the excavations and of the dam itself. The geology at the site consists of layered sands, silts, and clays which greatly increase the chances of encountering perched/trapped groundwater. In addition to the normal challenges in a project of this nature, Hurricane Harvey, currently the tropical storm responsible for the most rain ever recorded from a storm event in the United States, occurred during the construction.

THE SOLUTION

Due to the complexity of the project, Griffin Dewatering’s licensed professional engineering team performed a comprehensive review of the available geotechnical information and joined the Granite team for test pit digs prior to each excavation to tailor the dewatering approach to the actual conditions encountered. Griffin has installed multiple wellpoint systems at the Addicks and Barker dams to allow for the safe, stable excavation of the new outlet structures and channels. All systems were installed by drilling, an acceptable installation method within the very close proximity to the dams.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >