Griffin Difference

Once Griffin was subcontracted, Griffin quickly provided an extensive dewatering submittal. Once approved, Griffin was under a very short time frame to install and pull together manpower, equipment, and materials. Not only did Griffin accomplish this in a short time frame, but Griffin delivered a successful dewatering system that lowered groundwater at the site as designed, ON TIME.

THE CHALLENGE

This project included the construction of a new 4.5-mile Setback Levee (SBL), which crossed two (2) existing drainage ditches. Shallow groundwater was encountered during subgrade preparation for installation of the two (2) drainage pipelines with Gatewell structures. Since dewatering was not anticipated, this placed the project on hold and required the extensive turn-key dewatering system to be fast-tracked.

THE SOLUTION

The contractor had to competitively seek out qualified bidders to handle the dewatering efficiently and effectively. Several meetings with the USACE were required to gain approval for the system design, price, and approach. The Griffin plan was ultimately selected for being the most responsive, complete, and capable bid, even though it was not the lowest cost. Griffin’s design consisted of deep wells, a dual generator system with an auto switch gear, and telemetry to remotely determine flows and notify in case of generator failure or a decrease in groundwater flow.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Avenue O Building D Project
Avenue O Building D Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington Project
Port Covington Project
Learn How >
929 Zurich Circle Project
929 Zurich Circle Project
Learn How >
IAA Project
IAA Project
Learn How >
L-611 Drainage Structure Project
L-611 Drainage Structure Project
Learn How >
Fort Eustis Sump Pit Structure Project
Fort Eustis Sump Pit Structure Project
Learn How >
Chesapeake City WWTP Project
Chesapeake City WWTP Project
Learn How >