Lifetime Parking Garage and Facility Project

Palm Beach Gardens, Florida

OWNER

Lifetime

CLIENT

Lifetime

PROJECT REVENUE

$252,000

TIME

2020-2021

D.CaseStudies Lifetime Fitness Florida Web 1
GRIFFIN DIFFERENCE

The project was successfully completed on-time in two phases to accommodate the construction schedule. The high water table, tight working conditions and logistical challenges were overcome by Griffin’s expert engineering and operations teams.

THE CHALLENGE

Part of the main building foundation had been excavated prior to installing a dewatering system and the site was not level in areas. In addition, we had to work around the existing utilities. We were able to install the system with track punch method and dewater the main foundation. We remobilized 6 months later to install a perimeter dewatering system for the parking garage foundation. We again had to work around existing utilities and needed to keep a large gap in the system for trucks to enter and exit.

THE SOLUTION

We installed approximately 1,000 LF of wellpoint system around the perimeter of the main facility and approximately 900 LF of wellpoint system around the perimeter of the parking garage. We closed the spacing on the parking garage wellpoints to ensure we completed drawn down for the deep excavations near the large opening within the system.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Avenue O Building D Project
Avenue O Building D Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington Project
Port Covington Project
Learn How >
929 Zurich Circle Project
929 Zurich Circle Project
Learn How >
IAA Project
IAA Project
Learn How >
L-611 Drainage Structure Project
L-611 Drainage Structure Project
Learn How >
Fort Eustis Sump Pit Structure Project
Fort Eustis Sump Pit Structure Project
Learn How >
Chesapeake City WWTP Project
Chesapeake City WWTP Project
Learn How >