PROJECT REVENUE

973K

TIME

2013-2014

D.CaseStudies Linvillle Dam Web e1680539259399
GRIFFIN DIFFERENCE

Our knowledge of the local geology allowed us to design the wellpoints with properly sized filter pack and reduced screen length. Additionally, we provided the owner flexibility with our O&M proposal. Finally, Griffin offered construction dewatering technical training to the Marathon integrity dig team.

THE CHALLENGE

The water table at the location was near the ground surface, requiring groundwater at site to be pre-drained prior to excavation. A “dry hole” would allow the welders to work safely to complete the pipeline repair. Griffin has extensive knowledge of the area and knew proper well construction was required to prevent the pumping of fines from the wells.

THE SOLUTION

Griffin provided expertise and oversight for the design and installation of an eductor system, wellpoint system, and sumping system for the deep excavation at the toe of dam. 58 eductor wells were installed to obtain the required drawdown and allow for construction of a safe and stable excavation.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >