Naval Special Ops Training Facility

California

OWNER

Government

CLIENT

Whiting-Turner

REVENUE

$478,000

TIME

2021-2022

D.CaseStudies P855 Photo Edit Web

GRIFFIN DIFFERENCE

Griffin successfully installed the dewatering system and achieved required drawdown under the discharge flow limitations. Griffin’s design and installation methodology met both the schedule and performance requirements of this challenging project.

THE CHALLENGE

The project required work on a sensitive government site with increased security and safety protocols. Schedule was critical and any delays were subject to costly liquidated damages. Functionally, stratified soil conditions and flow limitations at the discharge point made dewatering challenging.

THE SOLUTION

Installation of a deep well system along with a web of monitoring wells within the excavation zone. The flow was kept under the target discharge level while maintaining drawdown by measuring water levels in the monitoring wells and frequently tuning the dewatering system. Several pump tests were performed at different locations on site to better understand the hydrogeological parameters and estimate an accurate flow needed for each structure.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >