Petmin Pig Iron Plant

Ashtabula, Ohio

CLIENT

Beaver Excavating

OWNER

Petmin

TIME

2020- 2021

REVENUE

$600,000

D.CaseStudies Petmin 3
GRIFFIN DIFFERENCE

The equipment Griffin provided. We used multiple electric-powered wellpoint pumps (3), a diesel-powered standby pump, winterization equipment consisting of “Thawzall Ground Heating Units” with glycol lines next to the header pipe, discharge pipe and around the pumps with concrete blankets covering the piping and around the pumps. We provided local Union help to meet a stipulation in Bidding Documents to provide local labor participation.

THE CHALLENGE

Winter installation/operation on Lake Erie, upper fill material to jet through and a high impermeable layer at or near subgrade. Large footprint for building requires multiple pumps running.

THE SOLUTION

Griffin provided Trackpunch jetting installation of a wellpoint system around the perimeter of the foundation to the impermeable layer. Soils were fine in nature and required a sand filter pack enveloping the wellpoint screen and up to the surface to help drain layers of fill.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington
Port Covington
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >