Port Covington

Baltimore, Maryland

CLIENT

CBG

TIME

2021

D.CaseStudies Port Covington
GRIFFIN DIFFERENCE

Griffin has proven to be available, flexible, and customer-oriented since this project was initially planned. From design to operations, Griffin remained a responsive partner to the client to ensure a successful project.

THE CHALLENGE

The work required over 7ft. of drawdown in soil that consisted of layers of clay, silt and sand. The evolution of the construction plan required quick system adaptation to keep the project on schedule.

THE SOLUTION

After reviewing all possible dewatering options it was determined that wellpoint dewatering would be the most comprehensive and cost-effective solution. The system was equipped with an auto-dialer to alert all parties of a potential system interruption.

Griffin also provided dedicated backup pumps with auto-start capabilities, which would immediately start in the event of a primary pump failure. Griffin continued to work with the contractor to relocate pipe and road crossings allowing work to proceed in an uninterrupted fashion.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9
Santa Ana Mainstream-Reach 9
Learn How >
University of Nebraska-Kiewit Hall
University of Nebraska-Kiewit Hall
Learn How >
West Refueler and Solid Waste Facility
West Refueler and Solid Waste Facility
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
929 Zurich Circle
929 Zurich Circle
Learn How >
L-611 Drainage Structure
L-611 Drainage Structure
Learn How >
Fort Eustis Sump Pit Structure
Fort Eustis Sump Pit Structure
Learn How >
Chesapeake City WWTP
Chesapeake City WWTP
Learn How >
Decatur School Annex
Decatur School Annex
Learn How >