Bruin Project

Oxnard, California

CLIENT

Amazon

OWNER

Toro Enterprises

PROJECT REVENUE

$515,000

TIME

2020-2021

D.CaseStudies Project Bruin Pic 2 Web
GRIFFIN DIFFERENCE

Griffin successfully installed the dewatering system and achieved the required
drawdown while maintaining communication and excellent relations with the Client. The Client was happy and impressed with the Griffin Teams’ commitment to project success.

THE CHALLENGE

The client had an aggressive schedule. Dewatering the site was challenging due
to geology consisting of layered clay and silt. Several discharge locations were to
be used, which increased the complexity during the scheduling of site work.

THE SOLUTION

Griffin installed a deep well system around the entire excavation zone and additional localized deep wells around the pump stations. Extensive sumping efforts were required to maintain a workable surface. Water was routed to multiple discharge locations and utilized for dust control. The crew worked overtime and on weekends to meet the aggressive schedule needed to keep this project on track.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Avenue O Building D Project
Avenue O Building D Project
Learn How >
University of Nebraska-Kiewit Hall Project
University of Nebraska-Kiewit Hall Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington Project
Port Covington Project
Learn How >
929 Zurich Circle Project
929 Zurich Circle Project
Learn How >
IAA Project
IAA Project
Learn How >
L-611 Drainage Structure Project
L-611 Drainage Structure Project
Learn How >
Fort Eustis Sump Pit Structure Project
Fort Eustis Sump Pit Structure Project
Learn How >
Chesapeake City WWTP Project
Chesapeake City WWTP Project
Learn How >