Revo Apartments Complex Construction Project

Bound Brook, New Jersey

GC

Accurate Builders & Developers

OWNER

Sterling Bridge Investment Partners

ENGINEER

Jarmel Kizel & Susan Strauss Design

TIME

2019

D.CaseStudies Revo Apartments
GRIFFIN DIFFERENCE

Griffin provided a turn-key dewatering solution. Pre-Construction Planning and analysis resulted in a truly collaborative effort to find the safest, most cost-effective dewatering method.

THE CHALLENGE

The project location borders the Raritan River and an NJ Transit railroad. The high-profile location, with high pedestrian and vehicular traffic, plus high-powered utilities along the perimeter – made dewatering a challenge.

THE SOLUTION

Griffin utilized groundwater modeling data to create a custom dewatering solution based on the unique site requirements. Griffin used the data to design a combination wellpoint and sump pump dewatering system. Griffin designed and installed a 640lf perimeter wellpoint dewatering system to dewater the excavation during construction. The installed system successfully achieved the required drawdowns.

CALCULATOR

DEWATERING ADVISOR

Enter your excavation information to learn about options and considerations for selecting dewatering systems.

CASE STUDIES

VIEW RELATED POSTS

Santa Ana Mainstream-Reach 9 Project
Santa Ana Mainstream-Reach 9 Project
Learn How >
West Refueler and Solid Waste Facility Project
West Refueler and Solid Waste Facility Project
Learn How >
Alexan Old Town Project
Alexan Old Town Project
Learn How >
Port Covington Project
Port Covington Project
Learn How >
929 Zurich Circle Project
929 Zurich Circle Project
Learn How >
IAA Project
IAA Project
Learn How >
L-611 Drainage Structure Project
L-611 Drainage Structure Project
Learn How >
Fort Eustis Sump Pit Structure Project
Fort Eustis Sump Pit Structure Project
Learn How >
Chesapeake City WWTP Project
Chesapeake City WWTP Project
Learn How >
Decatur School Annex Project
Decatur School Annex Project
Learn How >